Our Visit to Bilkent City Hospital

Our Work
The replacement of our own production serpentines for the steam generators in Bilkent City Hospital has been successfully completed. During this process, our expert team worked meticulously to make the serpentines compatible with the existing system and ensured that they operate with high performance.
These changes have increased the efficiency of the hospital's steam generators and contributed to the uninterrupted operation of the system. Thanks to our own production serpentines, the hospital's energy needs have been met more effectively and the system has been provided with a long service life.